Community & PartnersSolar Calculator
Green Integrations
Start your assessment
Exhibitor · The Buildings Show 2026

Meet Green Integrations at The Buildings Show 2026

Bring a real facility. In 15 minutes we can help you evaluate commercial solar, energy performance, available incentives and a practical decarbonization pathway.

Dates
December 2–4, 2026
Venue
Metro Toronto Convention Centre
Find us
Booth 4030, North Building (PM Expo)
Drone view of a large commercial rooftop solar array installed by Green Integrations on an industrial facility in the Greater Toronto Area
The Buildings Show · Toronto
Visit us · Dec 2–4
Booth 4030
What to discuss at Booth 4030

What should your facility invest in next?

Four questions we hear most from commercial and industrial teams. Bring the one that matters to your site.

Is our roof and load profile right for solar?

We size systems to measured consumption and roof capacity, then model payback with the incentives your site qualifies for.

Discuss solar →
03Decarbonization

What does a credible reduction pathway look like?

We sequence efficiency, onsite generation and electrification into a plan your finance team can evaluate.

Discuss a pathway →

Can storage lower our peak demand costs?

We review interval data to see whether storage reduces demand charges, adds resilience or improves solar value.

Discuss storage →
Conserve · Power · Transform

A sequence of informed capital decisions.

Decarbonization is not a list of technologies. Each step sets the baseline for the next, so every investment is sized to what the facility actually needs.

  1. 01Step

    Conserve

    Audits, recommissioning and LED upgrades reduce demand and establish an accurate baseline before new systems are designed.

    Outcome

    Demand reduced and a clear baseline established.

  2. 02Step

    Power

    Commercial solar and battery storage sized to post-efficiency consumption, with incentives modelled into the financial case.

    Outcome

    Generation sized to real consumption, not pre-efficiency demand.

  3. 03Step

    Transform

    EV charging, energy monitoring and controls that support electrification and long-term energy strategy.

    Outcome

    Infrastructure in place for electrification and resilience.

Multi-site proof · Rabba Fine Foods

One client. Two facilities. Two differently sized systems.

Each Rabba site was evaluated on its own roof, load and operating profile. The result is two systems sized to two very different facilities — not one standard design applied twice.

1.4MW DC+

More than 1.4 MW DC of solar across two facilities

~1.57MkWh / yr

Approximately 1.57 million kWh of annual solar electricity production

Drone view of the 1,271 kW rooftop solar array at Rabba Fine Foods, Coopers Drive
Site 01 · Coopers Drive

Rabba Fine Foods — Coopers Drive

System size
1,271 kW DC
Annual production
1,412,187 kWh
Electricity offset
67.2%
View Coopers Drive project →
Drone view of the 137 kW rooftop solar array at Rabba Fine Foods, Brunel Road
Site 02 · Brunel Road

Rabba Fine Foods — Brunel Road

System size
137 kW DC
Annual production
156,919 kWh
Electricity offset
87.3%
View Brunel Road project →
Energy audit · Recommissioning

868,122 sq. ft. Ontario fulfillment facility

Two recommissioning measures alone identified significant savings — before other conservation measures and onsite solar were considered. The audit gave decision-makers a clearer basis for comparing operational improvements and onsite generation opportunities.

$70K+

Estimated annual savings potential from two recommissioning measures

View the Recommissioning Audit Case Study →

Project-specific estimates. Results depend on facility conditions, operating profile and scope.

December 2–4 · Toronto

Meet Us at Booth 4030
Book a meeting

Choose who you would like to meet.

15-minute conversations at Booth 4030.

Not sure who to meet? Choose any available team member. We can connect you with the appropriate specialist after the conversation if needed.

Plan your visit

The Buildings Show 2026

Venue

Metro Toronto Convention Centre, North Building (PM Expo)
Toronto, Ontario

Green Integrations

Booth 4030

Day 1Wednesday, December 2
9:30 a.m. – 5:00 p.m.
Day 2Thursday, December 3
9:30 a.m. – 5:00 p.m.
Day 3Friday, December 4
9:00 a.m. – 1:00 p.m.
Booth 4030 · December 2–4

Bring us one facility.

You do not need a finished project scope to have a useful conversation. Tell us what you are considering — solar, energy performance, decarbonization, storage or a combination — and we can help identify the next question worth answering.