Commercial solar lowers operating costs, improves property economics, captures available incentives, and stabilizes long-term electricity pricing. Integrated with energy audits, efficiency measures, and battery storage, it helps facilities build a more resilient and cost-effective energy strategy while reducing Scope 2 emissions.
Commercial rooftop solar can deliver levelized electricity costs as low as $0.04/kWh over the life of the system — compared to commercial utility rates that can exceed $0.20/kWh all-in.
Every dollar not paid to the utility improves Net Operating Income and increases asset value — converting a recurring expense into a long-term operating asset.
Commercial solar projects may qualify for utility incentives, tax credits, and accelerated depreciation programs that can significantly reduce upfront capital requirements and improve project economics. Many projects can recover a substantial portion of costs through available funding programs.
Commercial solar directly reduces Scope 2 emissions while supporting ESG reporting, procurement requirements, and long-term decarbonization targets.
Green Integrations assesses, designs, engineers, installs, and operates commercial rooftop solar systems for commercial and industrial facilities across Canada.
Commercial rooftop solar economics, shown with real results from completed GI installations.
System pays for itself through generation and incentives.
Commercial-grade panels generating into year thirty — roughly two-and-a-half decades of electricity after payback.
Food refrigeration and distribution facility, Mississauga, Ontario.
Utility analysis and load profiling established the facility’s consumption pattern and confirmed the capacity available for grid interconnection.
2,374 CSI Solar panels (535W each) designed across the rooftop. System capacity matched to electricity profile and interconnection constraints.
Rooftop installation with TerraGen racking. Fronius USA Symo 24kW inverters. Full ESA inspection and utility interconnection sign-off.
1,394,006 kWh generated annually. 67.2% of the facility’s electricity supplied by the rooftop system.
Review utility bills, interval consumption data, rate structures, and planned facility changes to establish a reliable electricity baseline and solar opportunity.
Develop the preliminary system layout, production estimate, incentives, payback, IRR, and long-term cash flow to confirm the business case.
Visit the facility to confirm roof, electrical, access, construction, and interconnection assumptions before advancing to engineering.
From electricity analysis through long-term operation, every phase delivers a defined output.
Complete structural, electrical, permitting, utility, and regulatory deliverables to move the project from concept to build-ready.
Install the system according to the approved design, coordinate inspections, and complete commissioning for commercial operation.
Monitor performance, complete preventative maintenance, support service needs, and provide reporting to protect long-term system value.
Load profile, operating schedule, and utility structure shape project economics. We design systems around the operational realities of each facility.
Electricity is one of the largest controllable costs in continuous manufacturing. We work with Ontario operators to reduce consumption, size generation around actual facility demand, and build the infrastructure for long-term cost stability.
Distribution centres, fulfilment facilities, and intermodal terminals operate around the clock with rising electricity demand. We plan and deliver energy programs around facility scale, demand-charge exposure, fleet electrification, and the cost of operational continuity.
Food and beverage facilities operate around refrigeration loads, sanitation schedules, HACCP requirements, and continuous production demands. We plan and implement energy programs around those operational constraints.
We work with Ontario farm operators and agricultural businesses to reduce operating costs through solar, storage, LED lighting, and electrical upgrades — planned around drying, irrigation, ventilation, and the broader agricultural year.
We work with Canadian commercial real estate owners, asset managers, and finance teams to reduce operating costs through solar, storage, LED lighting, recommissioning, and electrical upgrades — planned around NOI, BEPS compliance, and long-term asset value.
Municipal, social housing, and institutional energy projects operate on longer decision timelines and have additional procurement requirements. We plan and deliver energy programs around BEPS compliance, net-zero commitments, and public procurement frameworks.
Not sure where your facility fits? That's usually the right place to start a conversation.A 20-minute call is enough to map your load profile against the right scope of work.
End-to-end delivery, strong financial outcomes, and partnerships that extend beyond commissioning.
Green Integrations delivered a detailed financial model and system design that aligned with our production demands. The project was executed on time and performed as expected.
End-to-end delivery, strong financial outcomes, and partnerships that extend beyond commissioning.
Each integrates with the same assessment, financial model, and operating relationship.
The questions decision-makers ask — answered with data from completed Ontario projects.
On completed Green Integrations projects, payback typically falls in the 3–6 year range with a project IRR of 15–30%. The range varies by facility. Electricity consumption profile, available roof area, tariff structure, and access to provincial and federal incentive programs all affect the final figure. Facilities with high daytime loads and access to Ontario Save on Energy or the federal Clean Technology Investment Tax Credit tend to land toward the lower end of the range. A project-specific financial model — built from your utility data — is the only way to know where your project falls.
Installed commercial rooftop solar in Ontario typically ranges from $1.50 to $2.50/W DC for systems above 100 kW DC. Total project cost depends on roof type and condition, interconnection requirements, and complexity of the installation. An assessment gives you a project-specific figure rather than a per-watt estimate.
For projects where the goal is to offset a large portion of annual electricity consumption, it makes sense to look at efficiency and generation as part of the same plan. If a facility has meaningful lighting, HVAC, or controls inefficiencies, addressing those can reduce the consumption baseline. A solar system sized to a lower, optimized baseline tends to be a better fit for the building and produces stronger overall returns. This approach makes the most sense on projects where full or near-full electricity offset is achievable. Not every project warrants it — but when it does, having both under one roof simplifies the process significantly.
Most commercial solar projects qualify for stacked funding across three streams: Federal — Clean Technology Investment Tax Credit: refundable tax credit of up to 30% applied to eligible solar, battery storage, and electrification capital costs. Provincial — Ontario Save on Energy Solar Load Displacement Program: incentives up to $770K that support solar projects by funding systems that reduce baseline energy consumption. Federal — Enhanced First Year Capital Cost Allowance: 100% CCA accelerated depreciation on eligible clean energy investments in the first year. All three programs are identified and built into the project financial model as part of the assessment process.
Ontario commercial solar systems are designed for year-round performance, including winter. Cold temperatures can improve panel efficiency — the main variable in winter is available sunlight, not temperature. Production estimates are based on historical weather data for the specific project location, which accounts for seasonal variation in irradiance across Ontario, Alberta, and Nova Scotia.
Large flat industrial roofs are well suited for commercial solar. Ballasted or mechanically-attached racking systems work with most flat membrane roofs without penetration. Roof structural capacity, membrane condition, and remaining warranty life are assessed as part of the project scope. We have installed on BUR, TPO, Mod-Bit, Tar & Gravel, and metal deck roofs across Ontario, Alberta, and Nova Scotia.
Commercial solar systems in Ontario connect to the grid through the facility’s existing electrical service under IESO interconnection requirements. The process includes utility pre-application, engineering review, permit submission, ESA inspection, and utility sign-off. The interconnection process typically runs 8–16 weeks from application to approval, in parallel with construction. We manage the full process including coordination with IESO and the local distribution company.
System size depends on the facility’s electricity consumption, available roof area, grid interconnection capacity, and whether efficiency improvements are planned. For facilities targeting full or near-full electricity offset, understanding the building’s actual consumption profile before finalizing system size tends to produce better results. Completed installations range from 13.7 kW on a small food processing facility to 1,270 kW on a large food retail site in Mississauga.
Straight answers from our engineering team — explore the most-asked questions on this topic.